Dec. 15, 2025
Bathrooms in multi - storey residential and hotel projects are schedule - critical: traditional tiling demands 7–10 days for laying and subsequent waterproofing. Engineered stone shower wall panels from Russian shower wall cladding suppliers solve two B2B problems at once: they shrink the installation cycle to one day and reduce the budget by 18 % (NAO “RosTsenoobzor”, 2023). This guide provides a step - by - step procurement scheme for artificial stone panel wholesale and an ROI calculation for developers and dealers.

1.1. 0.3 % water absorption versus 12 % for porcelain stoneware—compliant with GOST 6787 - 2021 “High - Humidity Premises”.
1.2. One square metre of panel weighs 8 kg, whereas ceramics plus gypsum board weighs 22 kg: logistics savings of up to RUB 60 / m² on a 5 000 m² project.
1.3. The click - lock system allows one installer to lay 12 m² per hour—four times faster than conventional tiling.
Bottom line: a developer saves up to RUB 1.5 million on 100 bathrooms and hands over the project nine days earlier.
2.1. FSC - CoC certificate and Rosportebnadzor approval for engineered stone are mandatory for state contracts.
2.2. Minimum wholesale lot—300 m² (one pallet); request a price list broken down by 12 mm and 20 mm thickness.
2.3. Clarify production lead time: 10–14 days for major players (Moscow, Yekaterinburg), up to 21 days for regional plants.
2.4. Check logistics: delivery to the Northern Port of St. Petersburg costs 11 % less if the distributor uses a 40 HQ rail container.
Action: download the Excel TCO (total cost of ownership) template at the end of the article and plug in your numbers—the model already contains SberLogistik 2024 rates.
Input data: purchase 1 000 m² of artificial stone shower surround at wholesale RUB 4 800 / m², sell to developer at RUB 7 200 / m².
- Gross profit: RUB 2.4 million
- Logistics & storage: – RUB 210 k
- Income tax 20 %: – RUB 438 k
- Net profit: RUB 1.75 million
ROI = 36 % over a 45 - day turnover—higher than the ceramic equivalent (22 %). Use this slide - table at your investor meeting.
4.1. Ignoring the 3 mm thermal expansion gap causes bulging when temperatures swing from +20 °C to –10 °C (seasonal country projects).
4.2. Using cement - based adhesive instead of specified MS - polymer reduces service life by 30 %.
4.3. Omitting the waterproof apron under the shower trap risks a Gosstroynadzor fine of up to RUB 500 k.
Tip: sign a supply contract that includes technical support—2 % of the contract value, but it can save up to RUB 1 million in warranty claims.
- Platform “TenderPro” (subscription RUB 19 900 / month)—42 tenders for “shower cladding” in Q1 2024 alone.
- Exhibition “AquaTherm Moscow”, 26 Feb–1 Mar 2025; book a stand next to the “Engineered Plumbing” section—conversion rate 14 %.
- Telegram channel “Developers’ Breakfast” posts daily urgent requests from developers seeking shower wall cladding suppliers.
Download the ready - made 120 - word enquiry letter template—insert your tech specs and send within 24 h of tender publication.
Engineered stone shower wall panels are not just a trendy material; they are a cash - flow accelerator for Russian developers and dealers. Shorter installation cycles, full GOST compliance and a clear 36 % ROI make artificial stone panel wholesale a no - loss purchase. Download the TCO calculator and tender letter template now, or email us “B2B - request” at info@kotabaths.com to receive a price list and samples within 48 hours.
View hidden prices: Save time and reduce communication costs.
Get customized quotesTailored to your procurement needs.
Enjoy first-order discounts: Unlock special offers immediately.