Dec. 15, 2025
Russian hotel, residential-complex and fitness-center bathrooms share the same pain points: mold on grout lines, lengthy tile installation and downtime caused by repairs. Artificial Stone Shower Enclosure Panels eliminate these issues within 48 hours thanks to seamless solid surface shower walls. Below is a step-by-step B2B guide to closing 2025 with a 35 % increase in repeat orders.

1. Sanitary regulations (SP 60.13330) require smooth, non-porous surfaces. Custom shower enclosure panels made of engineered stone have water absorption <0.02 %, which is 12 times lower than that of porcelain stoneware.
2. Seasonal hot-water shutdowns (usually 2–3 weeks) make installation speed critical: solid surface slab shower walls are installed in one day, whereas tiles take 4–5.
3. Procurement teams at Pioner and Samolet networks cut their 2024 budgets by 18 % by switching from ceramics to shower surround panels from a B2B supplier in the Moscow region.
Action: contact the factory directly and request GOST 30726-2020 certificates to remove price objections from tender committees.
The Russian bathroom renovation materials market includes 27 manufacturers, but only four have Italian Formpress casting lines. Apply three filters:
- MOQ ≤ 30 m² – ideal for a pilot project (average hotel room = 6 m²).
- On-site CNC milling of faucet holes – saves two on-site working days.
- Stock of ≥ 1 000 sheets 900 × 1 800 mm in the Moscow region – reduces logistics to three days in the Central Federal District.
According to Rosstat 2024, 68 % of renovation delays are caused by material shortages. Work only with suppliers who can prove warehouse availability with a video report.
Example: Solnechny RC (Tyumen, 198 apartments).
- Tile 600 × 300 mm: RUB 36 000/m² (material + labor + waterproofing).
- Solid surface shower walls: RUB 29 400/m² (material + adhesive + installation).
Saving per apartment (4 m² bathroom) = RUB 26 400 × 198 = RUB 5.2 million.
Payback period for investment in custom shower enclosure panels = 0 months – the developer retains the funds immediately upon project handover.
1. Request a 150 × 150 mm sample and perform the “blue marker test”: the stain must wipe off without solvent.
2. Confirm the thermal expansion coefficient. For quality engineered stone bathroom walls it is ≤ 2×10⁻⁵ /°C, critical for Siberia (-40 °C in winter).
3. Include a 0.2 % penalty per day of delivery delay in the contract – factories agree more often than dealers.
4. Ask for Revit 2023 BIM models – reduces clashes by 11 % (LSR Group experience).
Artificial Stone Shower Enclosure Panels are not just “nice-looking walls”; they are a tool that accelerates project handover and minimizes claims from equity holders. Send your technical specification to info@kotabaths.com and receive a 12-month fixed-price quotation – before the 2026 VAT increase.
View hidden prices: Save time and reduce communication costs.
Get customized quotesTailored to your procurement needs.
Enjoy first-order discounts: Unlock special offers immediately.